Construction of the Parish Hall

A Chronicle by Pictures

1st imagewhich week and what happenedlast imageimagesParish Hall Corner
Week of 2019-01-27 (the 1st week)

The steel-work is assembled.

90 February 2018
Week of 2019-02-03 (the 2nd week)

The drywall goes up.

138 March 2018
Week of 2019-02-10 (the 3rd week)

Fitting the dust blockers

36 April 2018
Week of 2019-02-17 (the 4th week)

More dust blocking

138 May – June 2018
Week of 2019-02-24 (the 5th week)

Sealing for dust infiltration

67 October 2018
Week of 2019-03-03 (the 6th week)

classroom walls come down

84 December 2018
Week of 2019-03-10 (the 7th week)

Relocating the cry room

75 January 2019
Week of 2019-03-17 (the 8th week)

finish the cry room window and
a sense of space in the new hall

95 February 2019
Week of 2019-03-24 (the 9th week)

playing in the dirt

89 April 2019
Week of 2019-03-31 (the 10th week)

the foundations go in

48 May 2019
Week of 2019-04-07 (the 11th week)

a week of preparation for work to come

22 June 2019
Week of 2019-04-14 (the 12th week)

concrete in the footers

89 July 2019
Week of 2019-04-21 (the 13th week)

laying block; clearing trees for the water line

152 September 2019
Week of 2019-04-28 (the 14th week)

a week of fences

70 November 2019
Week of 2019-05-05 (the 15th week)

concrete pad work

62
Week of 2019-05-12 (the 16th week)

more concrete pad work

40
Week of 2019-05-19 (the 17th week)

preparing to move the outside walls

38
Week of 2019-05-26 (the 18th week)

adding steel along the hall outside wall roof

90
Week of 2019-06-02 (the 19th week)

dealing with steel, old and new

169
Week of 2019-06-09 (the 20th week)

sprinkler pipes, water line, adding steel

119
Week of 2019-06-16 (the 21st week)

laying block walls, sprinkler pipes, water line

254
Week of 2019-06-23 (the 22nd week)

laying block walls, sprinkler pipes, water line

154
Week of 2019-06-30 (the 23rd week)

water line work, sprinklers, and, Oh! it rained!

27
Week of 2019-07-07 (the 24th week)

more sprinklers, more rain,
digging out the ADA bathroom,
water line work

58
Week of 2019-07-14 (the 25th week)

the water line nears the church

120
Week of 2019-07-21 (the 26th week)

lining the gutters
water line arrives inside the building

56
Week of 2019-07-28 (the 27th week)

flushing chlorine from the water line
gutter liners installed
painting the cryroom
installing the movable partitions

74
Week of 2019-08-04 (the 28th week)

the flat roof goes on

30
Week of 2019-08-11 (the 29th week)

air soft floor
grading the drainage swale

66
Week of 2019-08-18 (the 30th week)

trenching the swale
new concrete above the air soft floor
repositioning light fixtures

66
Week of 2019-08-25 (the 31st week)

wall studs go up
overhead wall goes up
wiring in the hall wall
new hall gutter

170
Week of 2019-09-01 (the 32nd week)

sound insulation in the wall
drywall in the hall
grading for the ramp

60
Week of 2019-09-08 (the 33rd week)

hanging drywall in the hall
painting sprinkler pipes
new windows, doors

91
Week of 2019-09-15 (the 34th week)

sidewalk goes in
sump pump pit maintenance
drywall work

114
Week of 2019-09-22 (the 35th week)

sidewalks, drywall and trees

84
Week of 2019-09-29 (the 36th week)

finishing drywall
installing drop ceiling, light fixtures, sprinkler pipes
sprinklers in the basement

58
Week of 2019-10-06 (the 37th week)

working on the hall ceiling

17
Week of 2019-10-13 (the 38th week)

pressure test the sprinklers
new bathroom plumbing

45
Week of 2019-10-20 (the 39th week)

ADA bathroom floor
hall, tiled

39
Week of 2019-10-27 (the 40th week)

painting
plumbing
electrical

95
Week of 2019-11-03 (the 41st week)

ADA bathroom
overhead LED lamps
electrical conduit

49
Week of 2019-11-10 (the 42nd week)

basement electrical panel
carpet on the columns
shower door
painting
new sump pumps

42
Week of 2019-11-17 (the 43rd week)

glass in the doors
marble repair
new bathroom
St. Nicholas, back on the back wall

18
Week of 2019-11-24 (the 44th week)

sprinkler in the basement stairs

2
Week of 2019-12-01 (the 45th week)

digging to cut off the old water line
cleaning the new tile floor

15
Week of 2019-12-08 (the 46th week)

New hall, ready for use

10
Week of 2019-12-15 (the 47th week)

dedication and blessing

46
Week of 2019-12-22 (the 48th week)

looking for text/2019-12-22.txt

2
Week of 2020-01-19 (the 49th week)

looking for text/2020-01-19.txt

8
Week of 2020-01-26 (the 50th week)

looking for text/2020-01-26.txt

2
Week of 2020-05-03 (the 51st week)

looking for text/2020-05-03.txt

2
Week of 2020-05-17 (the 52nd week)

looking for text/2020-05-17.txt

4
3589