back to top page2019-02-17

Week of 2019-02-24 (the 5th week)

Sealing for dust infiltration

2019-03-03
Monday
installing the upper dust blocking wall
taping the seams of the dust blocker
St. Francis back outside
snowdrops, sans snow
Tuesday
measuring the beams
bulkhead exposed
the old folding wall
Wednesday
bulkhead exposed
some old door slats
Thursday
bulkhead exposed
some old door slats
removing the drop ceiling
Friday
St Francis in the snow
snowdrops blooming in the snow