Week of 2019-07-21 (the 26th week)

lining the gutters
water line arrives inside the building

2019-07-28
Monday
new gutter lining
skylight flashing
shut off valve for the hydrant
water line arrives inside the church
Tuesday
water line arrives inside the church
Wednesday
pressure testing the line
preparing to repave
Thursday
landscaping the water line
parking lot repaved
landscaped water line
meter vault
air floor vents
water line pressure test
an interloper
Friday
landscaped water line
water line ready for bacteria testing
water line testing