Week of 2019-08-11 (the 29th week)

air soft floor
grading the drainage swale

2019-08-18
Monday
removing the old sidewalk
the new, flat roof
grading of the water line
laying out the new floor duct work
grading the swale
Tuesday
grading the swale
grading the new sidewalk
Wednesday
awaiting water meter installation
grading the drainage swale
lining up the air soft floor
Thursday
the new restroom-shower
drain pipe under the swale
air soft floor ready for cement