back to top page2019-08-11

Week of 2019-08-18 (the 30th week)

trenching the swale
new concrete above the air soft floor
repositioning light fixtures

2019-08-25
Tuesday
trenching the swale
new concrete above the air soft floor
new hall at large
new concrete filling the former hallway
preparing the door frame
a view of the hall from the new storage area
new door sill at the old side doorway
added new door sill
lifting the sidewalk for the swale drain
Wednesday
lifting the sidewalk for the swale drain
Thursday
vestibule access ramp
newly poured floor
metal studs for hall walls
light fixtures awaiting repositioning
Friday
taking down the vestubule wall
putting up studs for new hall wall
stone for the swale drain
clearing site trash
studs for the new vestibule wall
sheet rock for vestibule wall