Week of 2019-08-25 (the 31st week)

wall studs go up
overhead wall goes up
wiring in the hall wall
new hall gutter

2019-09-01
Monday
trench for waterproofing application
wall studs go up
Tuesday
grading the swale
wall studs go up
temporary wall comes down
water pipe goes in
Wednesday
wall studs go up
overhead wall goes up
water pipe installed
a look at the hall
Thursday
grading the swale
trench for waterproofing application
overhead wall goes up
a look at the hall
holy water niche removed
hall wall studs in place
wiring in the hall wall
trench for pantry drainage
Friday
upper wall
removing old drywall
in the pantry
the storeroom
upper wall drywall complete
Saturday
new hall gutter
drainiage swale
gutter and downspout outside pantry
drywall at end of pantry
wiring in the pantry
wiring from the storage room