Week of 2019-09-08 (the 33rd week)

hanging drywall in the hall
painting sprinkler pipes
new windows, doors

2019-09-15
Monday
hanging drywall in the hall
painting sprinkler pipes
mudding drywall in the hall
window and door glass for new hall
water meter box, graded
laying out the sidewalk
putting in the windows
Tuesday
sump pump sumps
drywall in the new hall
new windows, installed
new door ferames, installed
new drywall, above pantry area
the hall
preparing for grass
new ADA entrance
hall window glass installed
ADA entrance
vestibule into hall door
hall windows, the inside view
hall drywall
fire annunciator panel
new ADA door, from the vestibule
ceiling now stained where the bulkhead was
Thursday
the new ADA bathroom
the swale
the new hall, windows and doors
more wiring in the hall
preparing for grass seeding
glass now installed
electrical work in the hall
Friday
drywall work