Week of 2019-09-22 (the 35th week)

sidewalks, drywall and trees

2019-09-29
Monday
removing front sidewalk
patching the last hole
front sidewalk removed
sanding drywall
getting ready for new sidewalk
removing ramp forms
primer for the drywall
Tuesday
prepared for new concrete
hold down the dust
topsoil spread about
drywall primed
installing sound insulation
sidewalk forms
Wednesday
sidewalk forms
tree landscape contractor
sprinkler installer
new sidewalks
FIOS repair
Thursday
new sidewalk under old front steps
drop ceiling support wires
sprinkler pipes in the hall
insulation under new roof
Friday
drop ceiling support wires
sprinkler pipes in the hall
watering new plantings