Week of 2019-10-27 (the 40th week)

painting
plumbing
electrical

2019-11-03
Sunday
water from the swale
Monday
partition demonstration
ADA bathroom; some assembly required
painting
ADA framing walls
tiling the hall ceiling
wiring the heat exchanger
pulling electrical line basement to pantry
grass growing
drilling holes for electrical conduit, sewerage pipe
Tuesday
painting
tiling the hall ceiling
in the storeroom
outside wall classroom
Wednesday
painted
putting on the baseboard
the hall ceiling
basement stairwell, sealed
electrical, plumbing piercing the basement wall
Thursday
ADA bathroom
electrical, plubming lines enter the basement
just hangin' on
Friday
modifying a door
new sewerage system
railings for the ramp
Saturday
railings for the ramp
electrical conduit at the ready
where the conduit goes
an inside view of the conduit
a clearer view of what's inside